Following a fire incident at a petrochemical facility, TechCorr conducted a comprehensive API 510 compliance inspection of a horizontal drum vessel. The inspection included visual examination, ultrasonic thickness measurements, weld inspection, and metallurgical analysis to assess fire damage and determine fitness for service. The assessment provided the client with a detailed repair plan and compliance documentation for return-to-service.
All Resources
Ensuring Asset Integrity Post-Fire: Horizontal Drum Vessel Inspection
A comprehensive external API 510 Compliance inspection evaluated structural integrity following a fire incident.
Case Study February 20, 2025
ShareinLinkedIn
